NDT, UT Senior Officer
Publish Date
Closing Date
Start date:12/07/2023
End date:22/07/2023
Salary Scale:
Garde B
Report to: Afghan gas director
Terms of Reference
1. Background:
Ministry of Mines and Petroleum is an enabler of the sector’s development and steward of all
mineral and hydrocarbon resources through the implementation of international best practice,
policies, regulations and procedures to encourage environmentally and socially acceptable private
investment.
The development of Afghanistan’s gas resources has been identified as a critical link for long-term
security and diversification of energy supply, growth, and stability for the country. Over the short
term, indigenous gas resources offer opportunities for increased energy access and energy security
and create the space for the deployment of variable, intermittent renewable energy.
Two gas-to-power projects are being implemented: (a) a 52 MW gas power plant in Mazar-e-
Sharif (‘the Mazar IPP’) and (b) a 40 MW gas power plant in Sheberghan (‘Sheberghan IPP’).
The implementation of both projects is dependent on confirmed access to sufficient and
sustainable gas supplies from the productive fields around Sheberghan, sustained investment in
the development of upstream gas production and processing capacity, and transport capacity to
deliver long-term gas supply to existing and prospective off takers
Optimization of field facilities in Yatimtaq and Khoja Gogerdaq fields to deal with increased
offtake volumes, including gathering systems, separation, dehydration, compression and
desulfurization, will now be required. In addition, a new amine plant has been recommended for
backup during downtime for maintenance and repair of the existing plant and to de-risk
investments by ensuring an uninterrupted gas flow to current and prospective off-takers.
Existing pipeline between Mazar-e-Sharif and Sheberghan. The original 90 km pipeline, still in
operation today, was commissioned in 1971. Over time the existing pipeline system went into
disrepair due to corrosion and lack of maintenance. In 2013 and 2015, large sections of the old
pipeline were replaced with support from the U.S. Task Force for Business and Stability
Operations (TFBSO). However, to meet increasing demand in the Mazar area from the planned
IPP, the pipeline needs to support much higher pressures than it can currently withstand. The
nameplate Maximum Allowable Operating Pressure (MAOP) of the pipeline is stated at 83 bars;
at present it is transporting about one-tenth of its capacity at one-fifth of its nameplate MAOP.
Given its age and condition, the existing pipeline can no longer be refurbished or safely pressurized
to deliver twice the currently transported volume to meet the proposed Mazar IPP requirements.
To meet increasing demand in the Mazar-e-Sharif area from the planned Independed Power
Producers (Mazar IPP, NFPP and others), the pipeline needs to deliver much higher gas volumes
than currently transported volume to meet the gas consumers requirements.
New SMPL. In addition to its efforts to rehabilitate the existing pipeline and considering the
limited practical scope for its refurbishment, TFBSO purchased and delivered pipe and some
associated materials for the construction of a new 94.5 km (12 inches in diameter) pipeline in
2013/14. Starting in 2015, Afghan Gas Enterprise (AGE) began to undertake the construction of
the new pipeline, and approximately 44 km has been laid and partially trenched along the route of
the old SMPL.
2. Scope or Work:
The quality of the welds shall be determined by non-destructive testing (NDT) testing as per
ASME B31.8 & API 1104.
NDT shall consist of the following:
• Visual examination.
• Ultrasonic testing.
• Liquid Penetrant / Magnetic particle testing.
• Hydrostatic testing.
3. Deliverables:
• Manual of procedures to conduct, record and manage NDT, UT examination.
Upon completion of the examination the examiner shall prepare an examination report,
for each weld or area of weld examined, using Ultrasonic Examination Report. All
restrictions which limit the effectiveness of the test must be recorded.
• All reflectors greater than 50% of the reference level shall be reported and shall be
described with regard to size, shape, location and probable identity/classification.
• In addition, sketches and drawings shall be prepared to support written descriptions.
Duties and Responsibilities:
• Utilize and set up equipment in nondestructive test
• Develop Processes and Procedure
• Ensure that all personnel and visitors follow basic safety procedures as applicable to
NDT, UT.
• Conducting tests in order to ensure the quality or detecting discontinuities using the
NDT, UT procedures of inspecting.
• Developing and instituting bespoke NTD, UT procedures for specified products and
materials during and after manufacturing.
• Identifying structural and material defects.
• Interpret test results.
• Prepare Test Report
Qualification and Experience:
• Minim Bachelor Degree in relevant field
• A minimum of 3 years’ operating and analyzing performing NDT, UT of butt welds
on high-pressure pipelines.
• Ability to read construction drawings and plans
• Good organizational skills
• Excellent communications skills, both verbal and written
• Experience in setting up, calibrating, training and drafting of procedures for NDT, UT
• Familiarity with the USM Vision, Mentor UT, USM GO
Skills and Abilities:
• Identify and define technical and administrative problems, identify and evaluate
alternative solutions, and select and implement the best alternative
• Apply principles of sound design and construction practices
• Prepare plan correction reports
• Use computer software to develop engineering and mathematical analysis for a wide
variety of design problems
• Review proposed projects to ensure compliance with regulatory requirements
• Prepare and check engineering designs, details, estimates, plans, and specifications
• Communicate effectively in oral and written form
Please send your CV and Cover Letter to the email address below not later than at 16:00pm. Please write in subject line: “ NDT, UT Senior Officer Pipeline project MOMP
Note: only shortlisted candidates will be contacted.
Email: recruitement.momp@gmail.com Cell#: 0093786060202